Scott T: The Blog
Refilling of the Lake
Posted Thu, Nov 26, 2009 at 5:11pm by ScottTagged: uni, water
It's been a few months since the last post, and considering the events I'm about to cover occurred back in September, it is safe to say they are a little overdue. Ultimately, Uni got in the way of things but I have some spare time again now, since I've finished for the year (and, possibly, ever :D).
Anyway, back towards the end of September a partial re-fill of the lake began. After nearly 2 years of separation, the water had receded quite some distance.
The refill this time is supposed to be up around the 26 gigalitre mark (source: ABC Online). Instead of the pipes used at the end of last year, a proper gate has been installed which allows a pretty reasonable amount of water through.
As usual, the Lake Bonney gallery has been updated with a few extra photos.